Going to be awesome when its done
Printable View
Going to be awesome when its done
Wow! That looks great. Keep the pictures coming.
The storage cabs got put in place and doors installed. The last cab on the loading run is in, too.
The tops are 1 1/4" MDF. They'll get stained a darker color then top coated. It's cheap enough I'll just replace it when it gets too ratty looking.
http://i27.photobucket.com/albums/c1...psby30e0wb.jpg
http://i27.photobucket.com/albums/c1...ps5l6qyhhp.jpg
What kind of base trim are you planning?
Too cool. I'm jelly.
I cut 5" base trim out of 1/2" mdf today. It's just going to have a chamfer on top to match the countertop edges. The case molding is 3" mdf in 5/8" thick, same detail. It will all get painted, along with the doors, in a muted earthy orange.
Including the tops, I used 39 sheets of material. There are a total of 35 drawers! I may have gotten a little carried away. Fortunately, Hoser and Stu talked me out of even more cabinets along two more walls.
Sounds great, I like tall base trim.
That would so drive me nuts knowing there is still white paint on the walls behind those cabinets.