That's how the burglars feel too.
Printable View
Went well today. Thanks again all!
Attachment 71897
Only a quick snap before the contractor showed up and kicked us out. Liability if we get hurt, schedule a time. Blah blah blah
Attachment 72192
Attachment 72193
For some odd reason I can't post more than 1 picture.
Painted interior and some cabinets are in place. Had a 3 week setback with flooring but should be going in this week. Had a set-back where they put a shower pan in the master bath but was supposed to be full tile - so that is now ripped out and awaiting tile install.
instead of doing an empty conduit from Garage to basement - they installed a 100 amp subpanel in my basement for no charge!!! "standard for them."
most of plumbing was done, heat was turned on and felt great. They are thinking we should be able to get in before Christmas.
thanks again all for the help and insight.
Congrats. Hope you get a chance and write up a conclusion, and maybe post a checklist. Hint, hint.[emoji477]
Who is your builder and what area outside of Cheyenne are you building in? We are looking at moving up there and I have an area, builder and floor plan in mind...but if it is the same builder, I want to PM you a couple of questions.
Builder is Summit View and would HIGHLY suggest them.
If you need a realtor, let me know.
Our address will be 248 Quarter Circle Loop. We are about 12 minutes from Walmart, and about 6 minutes from a Safeway. Feel free to PM me and I'll answer anything I can.
Same exact builder and area we are looking at actually. I will PM you when I am on a computer and not my phone.