-
The stuff fentonite is offering is peel and stick ice sheild it's for the edges. If there's enough for the entire roof it's overkill which is perfect.
Start at the bottom and make sure you overlap by 2-4 inches. Layering so water will flow down hill onto the next section like shingles.
Staples are fine. Caps are code but half the guys cheat and use staples anyways.
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules