Close
Results 1 to 10 of 59

Thread: Retaining Wall

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #22
    Gong Shooter
    Join Date
    Jul 2010
    Location
    Littleton
    Posts
    317

    Default Retaining Wall

    8 yards of dirt is not much. That's what I learned today. I need to add some teeth to the skid steer so I can rip the ground where I need to lower the grade near the house. But, all courses are laid and I'm ordering 14 yards of dirt to finish or get close to backfilling.

    My helper.
















    Sent from my iPhone using Tapatalk
    Last edited by husky390; 04-29-2018 at 19:55.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •