My limitation and hesitancy on wind is that Adams county limits you to 1 turbine. A few smaller turbines would fit the bill a bet better (especially vertical axis rigs), but you would need a permit exception. I have enough land to plant a solar field. Would probably pay better than farming it.






Reply With Quote
