Close
Results 1 to 10 of 80

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    QUITTER Irving's Avatar
    Join Date
    Nov 2008
    Location
    Denver, CO
    Posts
    46,527
    Blog Entries
    1

    Default

    I've definitely find that limbs take too long. My pit is so large it is not easily managed.

  2. #2
    Machine Gunner clodhopper's Avatar
    Join Date
    Oct 2011
    Location
    Rural Weld County, Colorado
    Posts
    1,245

    Default

    Quote Originally Posted by Irving View Post
    I've definitely find that limbs take too long. My pit is so large it is not easily managed.
    Consider reorganizing your system to a sequential one. Run several small piles of different ages rather than a single overwhelming one. In your current situation, decide what size mound you can work with what is available to you. Then break up your big one into smaller piles. Let some of them sit dry for the time being and focus on one or two. Keep the moisture up and turn them. As those start breaking down and making progress, add another pile to your schedule. Then, going forward, build one small pile at a time with waste, but keep the pile sizes manageable. One huge pile that is ignored does no good.
    14 . Always carry a change of underwear.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •