>20 weeks on some industrial controls (PLC hardware)
Very bad if say a power plant or wastewater plant can’t get repair parts. Let alone new construction.
>20 weeks on some industrial controls (PLC hardware)
Very bad if say a power plant or wastewater plant can’t get repair parts. Let alone new construction.
I am not smart enough to edit the "title"